Well drilling has been completed for replacement of well 2R and well 22R. Well pump testing and final installation of casing screens will be completed shortly. Well building designs will be finalized based on pump test results. Sections of rock were tested periodically throughout drilling, producing castings that can be tested and utilized to determine water quality and well depth.