Water Department personnel will be replacing waterline on Sublette St from Johnson St. to Arthur St. This project is being completed to replace pipe that has reached its useful service life and improve water circulation in the area. Design was completed by the Pocatello Engineering Department. Work will include approximately 2,100 ft. of mainline replacement, service line renewals, installation of fire hydrants, and restoration of disturbed concrete curb, gutter, and sidewalk. Pocatello Street department will be installing new asphalt pavement. The project is anticipated to occur July-August 2022.