September 5, 2018
This greenway trail project is nearing completion. The Contractor has been installing the new fencing, and preparing for asphalt which will go down later this week. The ribbon cutting for this project is planned for 5:15 on 9/11 at the Monte Vista end of the trail.
August 16, 2018
The contractor continues to work on placing the concrete retaining wall blocks. They will be done with the retaining walls this week.
August 8, 2018
The contractor has been working on getting the rest of the trail to the right subgrade. They have been working on the lower retaining wall that is visible from the interstate. This week they will be starting the retaining wall on the uphill side of the trail. Paving will start later this month.
July 3, 2018
The contractor is working on installing the curbing along the existing dirt road. Next Monday they will finish up the curb and gutter on this stretch and start excavations on the Farm Bureau side. There will be no construction from the 4th to the 8th.
June 26, 2018
The contractor has been working to install base and bring up grade to hit 5% slopes or less on the section of trail that is along the existing dirt road. They have also continued to clear and grub on the south side of the trail. Next week they will be pouring concrete for the curbing along a portion of the trail. The contractor will not be working from the 4-8th.
June 8, 2018
The contractor has been working on staking the route and clearing and grubbing the trail on the Monte Vista side. Next week they will begin to cut and fill on the Monte Vista side and clear and grub the Farm Bureau side.