This project includes repairs on a portion of the sewer main located south of the intersection of Andesite Drive and Dolostone Drive on Dolostone Drive. Repairs are anticipated to start early April, and will consist of removing and replacing 30 feet of sewer main. There should be no interruptions to sewer service or vehicle access. The construction will consist of excavating down to the sewer main being replaced and repaving the street.
Update
The Dolostone Drive sewer repair project was completed on May 14, 2018.