Due to historic flooding during larger rain fall events along Donrich Ave, the City of Pocatello Street Department has contracted with a local contractor for the installation of a small stormwater water pump station. Stormwater will be pumped from Donrich Ave to Tech Farm Rd and flow to existing storm water detention ponds. The project includes installation of pumps, piping, electrical control panel, and stormwater catch basin. The project is expected to be completed mid-June 2020.